What We Do

Services

Every job we take on, from a full build to a two-board fix.

Home › Services

Everything we take on

Every job below is one we do ourselves across Chaparral.

Custom Deck Design

We'll sit down with you, look at your yard and your house, and figure out a layout that actually gets used instead of just admired. That means thinking through sun exposure, where the shade falls in July, and how you'll actually walk in and out of the house.

Deck Installation

We dig and pour footings below frost depth, frame with treated lumber or steel, and build the decking on top to whatever material you've chosen. Every ledger board gets flashed where it meets the house, because that's the spot that rots a deck from the inside out.

Deck Repair

Sagging boards, wobbly railings and cracked stair stringers all get the same treatment: pull it apart, find out why it failed, and rebuild that connection properly. Sometimes it's one joist. Sometimes the whole substructure has to come out.

Deck Staining & Sealing

Sun out here bakes the oils out of wood fast, and an unsealed deck will gray and start to splinter within a couple of summers. We strip, sand and reseal with a finish rated for high UV, and we'll tell you honestly how often it should get redone.

Composite Decking

Composite costs more up front but doesn't warp, crack or ask for repainting the way wood does in this climate. We install it over the same properly-flashed framing as a wood deck, just without the yearly maintenance.

Deck Railing Repair & Installation

A railing that shifts when you lean on it is a post that's rotted at the base or was never bolted into solid framing. We reset or replace the post, tie it back into the joist properly, and build it to code height.

Deck Resurfacing

If your framing is still solid but the decking boards are cupped, splintered or just tired, we can pull the old boards and lay new ones without rebuilding the whole structure underneath. It's a faster job than a full rebuild and costs less.

Pergolas & Deck Covers

A pergola or shade cover over an existing deck cuts the surface temperature enough that you can actually sit out there in August. We build them to tie into your existing structure or as a standalone addition.

Deck Demolition & Removal

Old decks that are rotted through, built without permits, or just in the way of a new project get torn out and hauled off. We'll check what's salvageable in the framing before we demo the whole thing.

Multi-Level Deck Building

Sloped yards or walkout basements often call for a deck that steps down in stages instead of one flat platform. We plan the stair runs and landings so the levels feel connected instead of like separate decks stacked together.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Chaparral, NM

This is the ground we cover for deck work, give or take.

Chaparral, NM
El Paso, NM
Las Cruces, NM
Sunland Park, NM
Anthony, NM
Santa Teresa, NM
Canutillo, NM
Fabens, NM
Vado, NM
Mesilla, NM
La Mesa, NM
Common Questions

Things worth asking

Questions that come up once a project actually starts.

Do I need a permit to build a deck?
Most raised decks require a building permit, especially if they're attached to the house or higher than 30 inches off the ground. Pulling permits and scheduling the required inspections is handled as part of the job.
How long does a deck installation take?
A standard ground-level deck usually takes one to two weeks from footing to final board, weather permitting. A multi-level deck with stairs and built-in railings can take three to four weeks.
Can you work within a set budget?
Material choice is usually the biggest lever on price, so a fixed budget usually means choosing pressure-treated pine over composite or scaling back the footprint slightly. The design gets adjusted to fit the number before construction starts, not after.
Do you guarantee your deck work?
Workmanship is covered under warranty for a set period after completion, with details spelled out in the written quote. Materials like lumber and composite decking carry their own manufacturer warranties separately.
Who will I be dealing with during the project?
The same crew that measures the site and builds the deck stays on the job, so questions during construction go to the people actually doing the work rather than a separate office contact.
What decking materials do you work with?
Pressure-treated pine, cedar, and composite decking are the three most common choices, each with different upkeep and cost. Pine is the cheapest upfront, cedar looks better longer with sealing, and composite carries almost no yearly upkeep.
Can I still use my yard while the deck is being built?
The immediate work area around the deck footprint needs to stay clear for tools, lumber, and footing excavation, but the rest of the yard stays usable during construction. Access points and material staging get discussed before the first day of work.
What should I do to prepare my yard before the crew arrives?
Clearing furniture, planters, and anything breakable from the work area makes the first day faster, and marking any buried sprinkler lines or dog fencing helps avoid damage during footing excavation. Everything else gets handled by the crew.
What happens if you find rot or damage once you start the job?
Hidden rot in ledger boards or support posts sometimes shows up once old decking is pulled up, and that gets flagged and priced before replacement work continues. Construction pauses on that section until the homeowner signs off on the added cost.
How do I take care of my deck after it's built?
Wood decks should be restained every two to three years in this climate because UV exposure breaks down the sealant faster than in milder areas. Composite decking mainly just gets an occasional wash to clear dust and debris, with no sealing required.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (575) 376-7832